Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13693823

- Product Categories
- Friendly Links
Information Name: | MGC1.1-6 Fixed trunk tub, MGC1.1-6 fixed trunk tub Professional |
Published: | 2015-04-14 |
Validity: | 365 |
Specifications: | MGC1.1-6 Fixed trunk tub |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | MGC1.1-6 Fixed trunk tub MGC1.1-6 fixed trunk tub MGC1.1-6 fixed trunk tub Products MGC1.1-6 fixed trunk tub supply MGC1.1 -6 Fixed trunk tub surface and underground coal mine roadway transportation of coal and waste rock, a major transportation equipment. But also other non-metallic minerals, bridges, railway engineering, conducting excavation projects such as construction and transportation transport sand, gravel and other materials, a short-distance transport equipment. Zmjt11 MGC1.1-6 fixed trunk tub structure is simple and rugged in itself, its drag coefficient is small, large carrying capacity, easy maintenance, has a number of advantages when using a dumper carts unload the entire body Turn over. Fixed tub carriages and the frame fixed connection, to be used dumper will unload carts flip. The basic composition of the trunk, the frame buffer, couplings and running gear. Metal frame structure, can withstand traction, braking, collision force and impact buffer tub rail mounted between the frame ends to ease the impact between the two vehicles. Connector is coupled locomotives and tub parts, commonly used bolt and rotating chain link, a large tub using both automatic coupler buffer role. Travel agencies by four wheels and two axes consisting two wheels right. The sum of the tub and over 20 tons of material, generally should increase the number of rounds. For more than two wheels on the tub, for ease through the corners of the two wheels on the composition of a wheel of the car, this car is called bogie. MGC1.1-6 Fixed trunk tub Maintenance 1, regular replacement wheel bearing grease. Every three months shall be cleaned once bearings and replace the 3rd calcium based grease. Added in an amount of 65 to 80% of the reservoir cavity. 2, tub regular maintenance every three months once. 3, when the axle assembly can not use a sledgehammer beat any, should be no impact on the mechanical push. 4, when the tub is not in use generally open storage. For longer storage time of the tub, should be checked regularly. MGC1.1-6 Fixed trunk tub Technical Specifications Model: MGC1.1-6 Volume: 1.10 m3 nominal loading capacity: 1 ton maximum load capacity: 1.8 t gauge: 600mm Dimensions: Length 2000mm Width 880mm height 1150mm Wheelbase: 550mm Wheel diameter: 300mm traction height: 320mm Rated traction: 60KN The product has been exported to many countries, the United States, France, Canada, Indonesia, Russia, Vietnam, Australia, South Korea, Iran, was unanimously praised by customers. Due to production batches, depending on the model, the above picture is only for reference, the details can contact our sales staff to carry out specific verification. National unity free Sales Tel: 400-086-0537 |
Admin>>>
You are the 12587 visitor
Copyright © GuangDong ICP No. 10089450, Shandong coal mining All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12587 visitor
Copyright © GuangDong ICP No. 10089450, Shandong coal mining All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility